Test center Test center
Меню
тел./факс: +375 212 48-04-19
Пн-чт 8:00-17:00; пт 8:00-16:00; обед 12:12-13:00
e-mail: info@vcsms.by

Interlaboratory comparisons: Test center

Head of the test center

VOZHGUROV ALEKSANDR GENNADYEVICH
(0212) 42-63-12
+375 33 316-85-59 МТС
ic@vcsms.by

Leading engineer of the test center

BAGDIA MIKHAIL MECHISLAVOVICH
(0212) 42-63-12
+375 29 517-67-85 МТС
+375 25 623-85-77 Life
icmbagdia@vcsms.by


RUE "Vitebsk CSMC" carries out the following interlaboratory comparisons in order to check the qualification of accredited laboratories and laboratories planning to obtain accreditation status:

Information as of the 17th of January, 2017

Name of interlaboratory comparisons Number of submitted applications Application form Time of the previous ILC Current phase of ILC, additional information Time of the carrying out Estimated cost of the ILC, rubles with VAT
Constructional products and materials
(responsible – Verbitskiy Semion Yurievich)
VITCSMS-IC-CON-01

"Determination of the thickness of the concrete protective layer and location of reinforcement in reinforced concrete structures by the magnetic method in accordance with GOST 22904-93"
8 Application 10.2014
06.2018
Applications acception As the group completed 180,00 rub
VITCSMS-IC-CON-02

Quality control of construction and installation works. Filling of window and door apertures. "Determining the accuracy of windows and doors installation in the apertures." STB 1476-2004
2 Application 05.2016 Applications acception As the group completed

180,00 rub

responsible – Bagdia Mikhail Mechislavovich
VITCSMS-IC-CON-03


"Aerodynamic testing of ventilation systems. Measurement of average speed of air movement and volume flow of the air"
28 Application New Applications acception

Record form
Instruction
ILC are to take place from 08.11.2017 till 08.12.2017

30.10.2017 to all who applied for participation a set of financial documents and instructions is sent by mail
180,00 rub
VITCSMS-IC-CON-04

"Aerodynamic testing of ventilation systems. Measurement of excess air pressure and air pressure drop"
16 New Applications acception

Samples preparation
As the group completed 180,00 rub
responsible – Verbitskiy Semion Yurievich
VITCSMS-IC-CON-05

"Quality control of construction materials. Determination of the density of a sample of the correct shape in air-dry state"
2 Application New Applications acception

Samples preparation
As the group completed 210,00 rub
VITCSMS-IC-CON-06

"Determination of grain composition and sand fineness modulus in accordance with GOST 8735-88"
1 New Applications acception

Samples preparation
As the group completed 210,00 rub
Electrophysical measurement (responsible – Bagdia Mikhail Mechislavovich)
VITCSMS-IC-E-01

"Measurement of insulation resistance"
To the address, stated in the application a set of financial documents is sent immediately Application 10.2013
12.2014
01.2016
02.2017
09.2017

Applications acception, ILC carrying out on constant basis with reports issue with intervals of three times per year.

Record form

Instruction

10.10.2017 the report for the previous tour is sent

From 01.10.2017 till 15.12.2017 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participants as of 15.01.2018.

From 03.01.2018 till 01.05.2018 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participant as of 01.06.2018.


See also the information under the table

180,00 rub
VITCSMS-IC-E-02

"Measurement of the grounding device resistance"
To the address, stated in the application a set of financial documents is sent immediately 02.2014
12.2015
02.2017
09.2017

Applications acception, ILC carrying out on constant basis with reports issue with intervals of three times per year.

Record form

Instruction

10.10.2017 the report for the previous tour is sent

From 01.10.2017 till 15.12.2017 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participants as of 15.01.2018.

From 03.01.2018 till 01.05.2018 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participant as of 01.06.2018.


See also the information under the table

180,00 rub

VITCSMS-IC-E-03

"Measurement of the impedance of the "phase-zero "circuit (single-phase short-circuit current) during testing in electrical installations with voltages up to 1000 V with total earth of the neutral in non-explosive rooms."
To the address, stated in the application a set of financial documents is sent immediately 05.2014
11.2015
02.2017
09.2017

Applications acception, ILC carrying out on constant basis with reports issue with intervals of three times per year.

Record form

Instruction

Accompanying letter form

10.10.2017 the report for the previous tour is sent

From 01.10.2017 till 15.12.2017 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participants as of 15.01.2018.

From 03.01.2018 till 01.05.2018 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participant as of 01.06.2018.

See also the information under the table

180,00 rub
VITCSMS-IC-E-04

"Measuring the contact resistance"
To the address, stated in the application a set of financial documents is sent immediately 11.2015
02.2017
09.2017

Applications acception, ILC carrying out on constant basis with reports issue with intervals of three times per year.

Record form

Instruction

10.10.2017 the report for the previous tour is sent

From 01.10.2017 till 15.12.2017 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participants as of 15.01.2018.

From 03.01.2018 till 01.05.2018 – at any time convenient for ILC participant, agreed with the provider.

The extract from the report will be sent to ILC participant as of 01.06.2018.

See also the information under the table

180,00 rub
VITCSMS-IC-E-05

"Measurement of the parameters of protective shutdown devices controlled with differential current (UZO-D)"
12 New

Applications acception

Samples preparation

As the group completed

180,00 rub

Testing of protective means
(responsible – Bagdia Mikhail Mechislavovich)
VITCSMS-IC-T-01

"Testing of protective means – electric insulating gloves"
12 Application

04.2015
06.2016

Applications acception As the group completed

with the coordinator's visit at the participant’s location

230,00 rub

VITCSMS-IC-T-02

"Testing of protective means – voltage indicators up to 1000 V"
5 11.2016 Applications acception. As the group completed

with the coordinator's visit at the participant’s location

230,00 rub

VITCSMS-IC-T-03

"Testing of protective means – voltage indicators above 1000 V"
7 New Applications acception

Samples preparation
As the group completed

with the coordinator's visit at the participant’s location

230,00 rub

Physical factors of the environment
(responsible – Bagdia Mikhail Mechislavovich)
VITCSMS-IC-F-01

"Measurement of illumination in building premises and structures"
10 Application 06.2015 Applications acception As the group completed 180,00 rub
Determination of radionuclide activity
(responsible – Tolopilo Vera Nikolaievna)
VITCSMS-IC-RV-02

"Determination of radionuclide activity in food and agricultural raw materials and products (specific activity of radionuclide cesium-137) "
1 Application 06.2015 12.2015 08.2016 Applications acception

As the group completed

180,00 rub

Calibration
(responsible - Bagdia Mikhail Mechislavovich)
VITCSMS-IC-V-01

"Calibration of the power converter"
1 Application 05.2016 Applications acception As the group completed 180,00 rub
VITCSMS-IC-V-02

"Calibration of the AC voltage converter 0-125 В"
8 Application New Applications acception As the group completed

180,00 rub

VITCSMS-IC-V-03

«Поверка трансформатора тока»
2 Application New Applications acception As the group completed 210,00 rub

For accredited laboratories the participation in interlaboratory comparisons is an integral part of the current control (monitoring) of the correctness of the performed tests (P.5.9 STB ISO/IEC 17025-2007).

To fulfill the requirements of GOST ISO/IEC 17043-2013 our company is provided with the necessary material and technical base, qualified personnel for impartial performance of all types of work related to the ispection of qualification and for guarantee of confidentiality and competence in interlaboratory comparisons carrying out. For additional information, see the website of "Belarusian State Center for Accreditation".

A certificate of the participant will be issued to the organization participating in the interlaboratory comparisons. Based on the results of interlaboratory comparisons a report is prepared that includes data containing the results of all participants with indication of the performance characteristics of individual participants.


At the end of interlaboratory comparisons all organizations participating in interlaboratory comparisons are sent an extract from the report. The provider guarantees confidentiality of the information. All organizations participating in interlaboratory comparisons are issued a certificate of participation with indication of the individual code


If you wish to participate in the above-mentioned interlaboratory comparisons, please send a filled in application to Vitebsk Center for Standardization, Metrology and Certification (by mail: 210015, Vitebsk, B. Khmelnitsky Str., 20; fax: (0212) 42-63-12;icmbagdia@vcsms.by).

After the registration of your application and as the groups are completed (as a rule, no less than 20 participants), an agreement will be concluded with you for interlaboratory comparisons (ILC) carrying out, will be given an instruction containing the terms of the works performance and specific time for measurement will be agreed. If you applied but could not take part in the ongoing interlaboratory comparisons for any reason, you should apply again, as your previous application will be canceled.

It is allowed to use two different types of devices by interlaboratory comparisons participants, in this case two certificates of the participant with different codes are issued, additional payment is not taken.

Interlaboratory comparisons with codes E-01, E-02, E-03, E-04 are held on constant basis. Immediately after the measurements implementation the participant of the ILC receives the certificate of the participant and the extract from the report at the end of the current round. The periodicity is three times a year. To take part in the ILC with codes E-01, E-02, E-03, E-04 is possible for one visit, at a convenient time agreed with the provider.

If you receive a negative result in the ILC with codes E-01, E-02, E-03, E-04, you can participate in the next round of the same ILC without payment. Time of arrival should be agreed with the provider. Upon arrival, such participants must present the following documents of the previous round: a copy of the act of completed work, an extract from the provider's report made on the ILC, reports of the ILC participant, uncertainty calculation, certificate of the participant. A negative result is the receipt by the participant of an unsatisfactory or doubtful result on one of the statistics of functioning according to the extract from the report on the ILC.


If you are interested in receiving information about our interlaboratory comparisons, please inform us on icmbagdia@vcsms.by specifying your e-mail address to which you want to receive information and the area of your interest.

If you wish to participate in the above-mentioned interlaboratory comparisons, please send a filled in application to Vitebsk Center for Standardization, Metrology and Certification (by mail: 210015, Vitebsk, B. Khmelnitsky Str., 20; fax: (0212) 42-63-12; via e-mail: icmbagdia@vcsms.by).

We also provide methodological assistance in the development, actualization of measurement techniques, conduct an expertise, metrological confirmation of the suitability of measurement techniques

Measurement implementation methods that were developed by RUE "Vitebsk CSMC":
- MVI.VТ.113-2012 "Method of insulation resistance measurements implementation of electrical equipment and apparatus with a megaohmmeter" (with changes No. 1 as of 01.03.2013, No. 2 as of 01.06.2014);
- MVI.VТ.114-2012 "Method of short-circuit current measurements implementation at checking the protection operation in electrical installations up to 1000 V with a TN grounding system and contact voltage using EC0200 device" (with changes No. 1 as of 01.03.2013, No. 2 as of 01.06.2014 );
- MVI.VТ.115-2012 "Method of measurements implementation of the resistance of grounding devices relating to ground, ground resistivity, resistance of grounding conductors using measuring instrument F4103-M1" (with changes No. 1 as of 01.03.2013, No.2 as of 01.06.2014);
- MVI.VТ.121-2012 "Method of measurements implementation of short-circuit current measurements at checking of protection operation in electrical installations up to 1000 V with TN system using device Sch41160" (with changes No. 1 as of 01.03.2013, No.2 as of 01.06.2014);
- MVI.VТ.461-2014 "Method of measurements implementation of the "phase-zero" circuit resistance at checking the protection operation in electrical installations up to 1000 V with total earth of the neutral and resistance of the loop "phase-zero" using IFN-200".